204) Squires Tavern contractor work - week ending June 29, 2002
Plumbing contractor Clayton Webb has moved the sink to the new kitchen location. He has also removed a radiator and installed a hot water control valve and a hose connection in the basement. Electrical contractor Bob Morse has finished the thermostat wiring for 3 zones, wiring and switches for the front setting room sconces and finished wiring in the back parlor wiring and most of the front kitchen.